_____________________
Transportation and Stringing of line pipes for pipeline construction project
Considered to be one of the biggest logistical challenges of a pipeline construction project, stringing and transportation of mammoth-sized and weighted line pipes from steel manufacturing units up to the construction site is a critical process. The process includes loading and offloading, securing pipes to the chosen mode of transportation (trucks or trailers), hauling and stringing pipes together on the project right-of-way (ROW) which is usually in some of the most remote places.
PROJECTS HANDLED ___
Client : Punj Lloyd
Considered to be one of the biggest logistical challenges of a pipeline construction project, stringing and transportation of mammoth-sized and weighted line pipes from steel manufacturing units up to the construction site is a critical process. The process includes loading and offloading, securing pipes to the chosen mode of transportation (trucks or trailers), hauling and stringing pipes together on the project right-of-way (ROW) which is usually in some of the most remote places.
Work Order No. PLL/DBPL-F/PIIN25/SITE/A&A/022 – 30” dia Pipe Transportation from Chitradurga GAIL Yard (DS-2) to Harpanhalli PLL Yard, Chitradurga GAIL yard (DS-2) to Gadag PLL Yard, Harpanhall PLL Yard to ROW site & Gadag PLL Yard to ROW site for Dabhol Bangalore Pipeline Project Spread – F of M/s. GAIL India Ltd.,
Work Order No. PLL/DBPL-A/PIIN26/SITE/WO/066 dtd.23.09.2011 / 24.11.2011 Pipe size : 36” dia 13.5 mm, 14.3 mm & 17.5 mm thk transportation from Malkapur GAIL Yard to Dabhol, Devrukh & Abloli PLL Yard / ROW at Dabhol Bangalore pipeline Project Spread – A of M/s. GAIL India
Work Order No. PLL/MUPL/A&A/201101 dtd. : 13.04.2011
Transportation of pipes from Mundra (Gujarat), India to Gavhan, Taluka –Panvel for Mumbai – Uran Pipeline Project
Work Order No. PLL/PROJ/PIIN23/WO/03 dtd. 22.10.2009
The job consists of Transportation of 48” line pipes,
The activities involved to lift (Loading in scope of dump yard contractor) Line pipe from Pipe Dump yard at Samni (K 48.00) and Wagodia (K 121.00), transportation of lifted pipes to pipeline ROU, as per requirement stated by PLL representative to required destination of ROW. The approx 48” pipes, each nearly 12 meters as per different wall thickness of pipes 15.9, 17.5 & 23.8mm
Scope of Work
Consignments of 48 inch line pipes, each nearly 12 meters and with different wall thickness like 15.9 mm, 17.5 mm and 23.8 mm, were loaded from Pipe Dump yards at Sonari, Srigoda, Samni, Wagodia, Chikli, Kasa and Goveli and securely delivered to ROW locations for East-west pipeline project of M/S Reliance Gas Transportation Infrastructure Ltd. in Maharashtra and Dahej-Vijaipur Pipeline Project, of M/s Gail (India) Ltd in Gujarat.
The line pipes were inspected and transported from GAIL Yard at Bhillad near Vapi to the designated dump yard hired constructed, maintained and transported further along the pipeline route.
Apart from this bulk transportation projects for Punj Lloyd have been carried out from
[a] Valued consignment of 17.2 mm and 20.4 mm from Sonari to Ch. 840-855
[b] Valued consignment of 17.2 mm and 20.4 mm from Sonari to SriGonda Camp
[c] Valued consignment of 25.4 Sonari to 840-855
[d] Valued consignments of 25.4 sonari to Srigonda.
[e] Valued consignments from Srigonda to Km 840-855 (Bend Pipes).
Project II: Dabhol Bangalore Pipeline Project (DBPL)
Status of Project: Ongoing
Scope of Work
The scope of work spans the activity of shifting 150 pipes per day for Dabhol pipe laying project.
Route of transportation : From Chitradurga to Gadag, Karnataka(125 km)
From Chitradurga to Sira, Karnataka (125 km)
Total distance covered : 250 km
Total Load transported : 20,000 pipes to be transported using 3,700 trailers
No. of trailers : 3,700
Pipe dimension :
Outer Diameter (OD) = 30 inch
Thickness = 11.3 mm
Length = 40 feet
Project III: Mundra to Uran, Panvel ( MUPL) Project
Status of project : Completed in mid-2011
Scope of Work
The scope of work spans the activity of hauling 3,170 pipes from Jindal Steel, Mundra to project site at Navi Uran, Mumbai
Pipe dimensions :
Type I :
Outer Diameter (OD) = 10.75 inch
Length = 45 feet
Weight = 1.2 metric ton (per pipe)
Type II :
Outer Diameter (OD) = 2.11 inch
Length = 45 feet
Weight = 2.7 metric ton per pipe.
Total Load transported : 20,000 pipes to be transported using 3,700 trailers
No. of trailers : 3,700
Pipe dimension :
Outer Diameter (OD) = 30 inch
Thickness = 11.3 mm
Length = 40 feet
Transportation Time : One month
No of trailers : 170
Client: Essar Infrastructure
Awarded contract for and carried out successful movement of 48” line pipe (coated pipes and bare pipes) x 3.33 km from Designated Stock Yards to four different Right of Ways (ROW) for the Vijaypur Dadri Pipeline Project. The total length of pipes delivered:
Scope of Work: Spread -1 (Chainage 0 Km to 80.350 km), Spread-2 (Chainage 80.350km to 169.50 km) Total length 169.50 km. Thickness of pipes 17.5 mm, 25.4mm, 27mm
Section C – Spread – 5 (Chainage335 km to 418 km), Spread-6 (Chainage 418.3km to 498 km) Total length 163.00 k.m. Thickness of pipes 17.5mm, 25.4mm and 27mm.
Mode of Transport: Special low-bed ODC trailer
Client : Welspun
Scope of Project: Transportation of pipes from Welspun (Anjar) to Kathari Dump yard for Mundra-Bhatinda Pipeline Project of m/s HMEL
Total Load transported 16000 M.T